| Brand Name: | SUNHOUSE |
| MOQ: | 1 |
| Price: | Negotiation |
| Payment Terms: | T/T |
A container house order crosses three fields that rarely sit with one person — construction specification, export logistics and site installation. Most problems in this trade come from a gap between them. This checklist sets out what to agree before the deposit is paid.
| Item | Why It Must Be Documented |
|---|---|
| Model and dimensions | Prevents size disputes on delivery |
| Frame specification | Affects strength and service life |
| Panel core and thickness | Determines insulation, weight and fire behaviour |
| Floor construction and finish | Affects load rating and durability |
| Door and window schedule | Most commonly altered item after quotation |
| Electrical scope | Must match destination standard |
| Plumbing scope | Affects site works and unit weight |
| Packing method | Protects goods and affects freight cost |
Ask for the loading plan before you pay. How many units fit per container determines the real cost per building. A slightly cheaper unit that ships two per container can be far more expensive delivered than a better unit that ships four.
Usually one container, though this varies by model and supplier. Confirm before requesting a quotation.
Normally the buyer arranges site installation, with drawings and technical guidance supplied. Clarify the scope in the contract.
Packing list, installation drawings, electrical and material documentation where applicable, and the certificate of origin.
Inspect before signing, photograph the damage, and notify the supplier immediately with the packing list reference.
Pre-shipment inspection is commonly arranged by agreement. Confirm who attends and what the inspection covers.
Send your requirement list and destination port; we will return a specification, loading plan and delivered-cost quotation.